That is correct. I didn't understand that before. Just talked to an electrician who explained it to me. My takeaway was that I could theoretically run 200 amps on my 100 amp service. Each 120v leg is 100 amps.Our mains come in at 240 on two 120v legs
In practice I might be able to run 160 amps total (never go over 80% load on design). Running at 240v would make this easier as it would balance the load. If running at 120v balancing the load between the two would be more of a challenge.